MKSK’s Post

View organization page for MKSK, graphic

5,521 followers

MKSK is excited to be part of the multidisciplinary team designing Xavier University’s new College of Osteopathic Medicine. The nearly $110 million building was designed by architects The S/L/A/M Collaborative (SLAM) and MSA Design, with construction to be completed by Messer Construction Co. Features include a simulation hospital, a lecture hall, a meeting hall, and a teaching kitchen available as a gathering space for students. This major program facility will have a presence on Dana Avenue and continue campus development to the east. Outdoor program to include an Activity Terrace for student/faculty gathering, Main Entry space, limited faculty parking and accommodation of the extended Wasson Way Trail connecting to and through campus. Construction is set to be completed in 2026 and the college plans to accept their first class in the fall of 2027. For more information on this project, visit https://lnkd.in/eikWYTUE Rendering: The S/L/A/M Collaborative (SLAM) #MKSK #ShapePlace #PlacesforPeople #LandscapeArchitecture #UrbanDesign #Planning #Design #ASLA #APA #ULI #XavierUniversity #SlamCollaborative #MSADesign #MesserConstruction

  • No alternative text description for this image

To view or add a comment, sign in

Explore topics