Throughout Christmas and New year Quattro has been working on the blockade at Brookwood Station in Surrey. We’ve got 7 tracked excavators, 2 heavy lift Doosan wheeled machines and 2 dozers on the job to remove all points and track at Brookwood Station and replace/renew. We started at 0100 on the 23rd Dec and will be working till 2nd January (during a period of less travel). The Quattro team is part of a huge effort to ensure the railway between Woking and Farnborough runs reliably and safely. Thank you to VolkerRail Ltd, Southern Renewals Enterprise and Network Rail Southern. Watch this short clip broadcast on ITV News. With special thanks to Charlotte Tyler (Project Manager) 🙏🏼 Ian Marriner (Quattro Plant Fleet Manager (South) #rail #construction #switches #crossings #sleepers #maintenance #woking #Farnborough #engineering #Christmas #closures #trains #tracks #RRV #Qarmy
Kicking off Brookwood blockade 🙌🏾❤️🚂