SimScale’s Post

When Methanex Corporation detected a major leak, risking $3.5M in downtime, traditional repairs weren’t an option. Instead, they used SimScale to design and validate a containment solution in a single day—with no production interruptions. 💡 How They Did It: - Cloud-native simulations - Real-time stress analysis - Rapid design iteration “Without SimScale, we would have faced significant production losses.” – Jason Deaver, Reliability Supervisor ✅ Explore the case study here: https://hubs.la/Q02_zQPt0 #engineering #simulation #cloudtech #innovation #SimScale #industrialequipment

  • No alternative text description for this image

To view or add a comment, sign in

Explore topics