Steel Piling Group’s Post

Driving assistance methods can significantly improve the constructability of a #sheetpile wall. Jetting and pre-auguring are the main methods ⤵   ➡ Jetting involves delivering a water jet to the soil at the toe of the sheet pile, reducing friction.   ➡ Pre-auguring refers to the use of a continuous flight auger to penetrate the ground along the pile line in advance of the sheet pile installation. Soil should only be loosened along the line and not removed when using this technique.

To view or add a comment, sign in

Explore topics