Steve Claybrook’s Post

View profile for Steve Claybrook, graphic

Heavy Construction Specialist at Leica Geosystems part of Hexagon

When introducing new companies to 3D Machine Control I always stress: “the more complicated the design (or, the more of a pain in the *** it would be to set out using timber, pins, strings and spray)… the more advantage you have with MC1…” From complex, stepped retaining wall foundations, to swales, ponds and sweeping, undulating golf courses… the time/costs saved using 3DMC and a tilty will add up very quickly. Here we are shaping a logo I sketched out for an event using AGTEK Development Company, Inc. software but it should demonstrate the point I’m making. Also, when working to intricate designs, we can strip the graphics of the machine right back to just a floating red line showing the cutting edge of the bucket, for maximum attention to detail 🙌🏻 #whenithastoberight

Bill Smeeth

Skilled GPS, 2D, UTS Dozer/360 Operator/sssts

2mo

Is the machine on auto or operator control?

Like
Reply

Pretty awesome! Not sure why you are stressing! Everyone crushed it!

Tanvir Rahman

Excavator Operators maintenance and mechanic Have equipment

2mo

: Excavator Operator with 7 years of experience in manipulating heavy equipment in a safe manner. Performing maintenance checks, implementing safety measures, handling inventories, repairing and maintaining equipment, and removing debris.

Like
Reply
See more comments

To view or add a comment, sign in

Explore topics