When introducing new companies to 3D Machine Control I always stress: “the more complicated the design (or, the more of a pain in the *** it would be to set out using timber, pins, strings and spray)… the more advantage you have with MC1…” From complex, stepped retaining wall foundations, to swales, ponds and sweeping, undulating golf courses… the time/costs saved using 3DMC and a tilty will add up very quickly. Here we are shaping a logo I sketched out for an event using AGTEK Development Company, Inc. software but it should demonstrate the point I’m making. Also, when working to intricate designs, we can strip the graphics of the machine right back to just a floating red line showing the cutting edge of the bucket, for maximum attention to detail 🙌🏻 #whenithastoberight
Pretty awesome! Not sure why you are stressing! Everyone crushed it!
: Excavator Operator with 7 years of experience in manipulating heavy equipment in a safe manner. Performing maintenance checks, implementing safety measures, handling inventories, repairing and maintaining equipment, and removing debris.
Amei
Skilled GPS, 2D, UTS Dozer/360 Operator/sssts
2moIs the machine on auto or operator control?