Temporary Work Equipment Tests . #physicalexperiments #mechanicalexperiments #heatconductivity #concretetest #construction #constructiontechnology
Ticemlabs’ Post
More Relevant Posts
-
⓵ ⓶ ⓷ There are 3 grades of Ex inspection - visual, close and detailed. ⓷ Detailed inspections are carried out on completion of the installation, when it has been handed over by the installation contractor, and following the equipment being commissioned. It encompasses aspects covered in a close inspection but goes further by identifying defects such as loose terminations which are only apparent by opening up the item of equipment/enclosure or where necessary utilising tools and test equipment. As well as on an initial inspection basis, detailed inspections are carried out on a sample basis and require the disconnection of power. Detailed inspections are also compulsory following any invasive maintenance to plant and its wiring, including disconnection and relocation. https://lnkd.in/guChe_PV #AtexInspections #AtexSpecialists #ElectricalContractors #DSEAR #Inspections #Maintenance
To view or add a comment, sign in
-
Caught by associate! While my work 100% major entirely in #crane #engineering, I neglected my #lift and #escalator SPE/LEI works. Today, under his strict 1-1 supervision for quality work, I finally tackled my first escalator modernization work and first logged in LEAP for submission as #SPE. Lesson taught by associate: balance is key!
To view or add a comment, sign in
-
Attention all Testing, Inspection and Thorough Examination Occupations for: 👷 Plant, Machinery and Equipment, 👷 Construction Anchors and Fixings, 👷 Leak Detection in Waterproof systems, and 👷 Dynamic Piling Here's your chance to shape the future of your industry. 🛠️ If you work in the above occupations as an employee or contractor, you can help create a Competence Framework to define the Skills, Knowledge, Experience, and Behaviours for someone working in these areas. Get involved by clicking on the link below and completing the form ⬇️ https://bit.ly/3BklKC8 #CITB #FeedbackTime #CompetenceMatters #Standards #CompetenceFrameworks
To view or add a comment, sign in
-
Our engineers carried out a detailed inspection of the electrical and mechanical systems in the Blackwall sub-tunnel. Due to its Confined Space Classification, entry is only possible when the main tunnel is closed, with proper safety gear and training required. #hybridassetsolutions #assetmaintenance #tunnel #reactiverepairs
To view or add a comment, sign in
-
“ Top 7 High Risk Activities in #Substation Projects.” 01 - Excavation 02 - Work at Height 03 - Confined Space 04 - Electrical Works 05 - Lifting Operations 06 - High Voltage Testing 07 - Movement of Heavy Equipments P.S. The control measures are in the first comment👇✊
To view or add a comment, sign in
-
Infrastructure testing/pipe testing: "Ugh! Hey, don't forget we need to test this pipe... and the Manholes, and while we are discussing it we will need to bypass and block the line also. Hey, we don't own that equipment! What a pain! I don't know anything about pipe testing, plugs, and I feel unsafe as I don't know what we need?" Does this sound familiar? Your safety is our #1 priority. Let United Rentals Trench Safety lead the way with our industry experts who will help you select the right equipment in order to get the job done safely, on time, and on budget. Call us today so we can help you with a solution that fits your need. We will help to identify the correct equipment for your application. Plug Selection Back Pressure Determination Plug Size Selection Pipe Design Calibrated gauges: Monitor inflation and back pressure with calibrated pressure gauges only. Cleaning and Inspection We are here to help! #infrastructuretesting #infrastructure #infrastructureprojects #pipework #pipeplugs #safety #unitedrentals #unitedrentalstrenchsafety #trenchsafety
To view or add a comment, sign in
-
The silent hero of your system. The check valve, working tirelessly behind the scenes. For Inquire Now -:👇🏻 🌐: https://lnkd.in/dM4W4sAS 📞: +91 84879-48488 📍: https://lnkd.in/dJZB4zh2 #metflowsengineers #CheckValves #Valves #Engineering #FluidControl #MechanicalEngineering #IndustrialDesign #ProcessControl #Piping #FlowControl #ValveTechnology #FluidMechanics #EnergyEfficiency #Maintenance #WaterManagement
To view or add a comment, sign in
-
Day 271 / 366 The Technical Knowledge bite series continues (7/12) , this week's bite is on Fixed Ladders and BS 4211:2008. 👨🎓 ** Technical Knowledge Bites ** are a concise, bite-sized presentation perfect for a lunch break or reading over breakfast at the weekend! crafted by Dean Tedstone IEng, MSc, BEng (hons), the Pressure Systems Technical Manager at Applus+, these sessions offer quick, digestible overviews on essential industry topics. BS 4211:2008 is a British Standard that provides specifications for "permanent fixed ladders" designed for industrial and building access. This standard outlines the requirements for safe design, construction, and installation of ladders that are fixed in place, ensuring they meet rigorous safety guidelines to prevent falls and injuries. BS 4211:2008 addresses aspects like ladder materials, rung spacing, structural integrity, and handrails. It’s particularly relevant for environments like warehouses, factories, and construction sites, where safe, durable access is essential for both workers and equipment maintenance.. 👩🎓 Stay tuned for more of these informative posts, and feel free to engage with the content -let's learn and grow together. If there is a topic you would like to read about let me know. DM or email me at Ben.lumley@applus.com to see how Applus+ can help with NDT, Pressure Systems and specialist access. #ndt #inspection #listening #technology #energy #team #oilgas #renewables #competency #experience #ladders
To view or add a comment, sign in
-
Concurrent work activity and planning: Concurrent work may involve other concurrent permitted work activities or operational activities occurring during the permit period. The asset owner shall ensure that. concurrent work activities are taken into consideration. The asset owner is accountable via the permit issuer. Potential conflicts involving concurrent work activities include: ● Location – e.g., work on a scaffold immediately above another work party at ground level. ● Equipment/System – e.g., multiple activities on the same equipment system such as inspecting and cleaning a vessel. ● Activity – e.g., Hot work near a breaking containment activity on a hydrocarbon containing equipment. ● Exposure – e.g., radiography, abrasive blasting, etc. that produce harmful exposures to others.
To view or add a comment, sign in
-
Field Operations Engineer 🖤💀⚙️ Have you worked with this type of artificial lift? I will upload a video of the unit later 🔥 How is the Startup and Shutdown of this unit? - Starting up the XLS Unit 1. Visually check the XLS equipment and its surroundings for hazards or equipment that may interfere with normal operations and clear any that may be found before continuing. 2. Look over the main frame assembly to verify that the cylinder, pulley assembly and support bars are aligned with the wellhead. If anything seems out of alignment refer back to the installation section. An incorrectly aligned unit will cause premature cylinder, seal, and other possible structural failures. 3. Controller in Auto Cycle mode for XLS units 4. Familiarize yourself with the controller and shutdown procedures before starting the unit. 5. Check for hydraulic leaks 6. Check for loose screws, fittings, hoses, electrical connections. - Stopping the XLS unit - (Non-emergency stop) 1. Press the "Stop and Hold" button on the main controller screen. B. Then press the "Go to Home Position" button. 2. Make sure the Load Hold Valve button is turned off on the OptiMax™ Screen, after the operation manual is completed. 3. Return to the Home screen and press the "Stop Motor" button to turn off the main motor. 4. If the controller is not operating, manually lower the master cylinder if the XLS unit stops in any position other than the lowest position by pulling the release valve handle located on the charge holding manifold to lower the rod of the cylinder. #oilgas #wellservices #professionalexperiences #engineering #ecuador #petroleumengineer #wellintervention #engineer #work #moments #worksafe #workhard #IADC #IWCF #PetroleumServices
To view or add a comment, sign in
18 followers