UEA recently delivered another significant HDD project in Badgerys Creek, NSW. The 580 metre string of 1000mm HDPE was installed over a period of three days and required three tie in welds. Thank you to Athassel Civil, ACCIONA and the project team involved in successfully executing this project. #hdd #wsaga2 #uea #gallagher #gallagher660 #maxirigs
UEA Group’s Post
More Relevant Posts
-
Survey Inspection of Lattice Girders at Vertical Shaft before Shotcrete #hydropowerproject #latticegirder #tunnelconstruction #verticalshaft #ytshorts #civil #undergroundconstruction #civil3dpro #viralvideo
To view or add a comment, sign in
-
A project which demonstrates that when the client and specialist contractor are prepared to work together as a team installation issues and setbacks can be overcome. This project found the ground to have a STP-N above 50 which required both parties agree to a change to the method of installation and introduce engineered designed tooling to allow the pilot head to be steered and the auger head to cut through the strong layered mudstone. This design change combined with changes to the installation procedure as increased the confidence for the use of guided auger boring in challenging ground conditions. Trenchless Solutions Limited have the capabilities due to the strong supply chain and installation equipment to be able to deliver projects utilising multiple pipe materials. If you have a project do not compromise the project with multi stage pipe installation, contact Trenchless Pipe Supplies directly through simon.marsh@trenchlesssolutions.co.uk or visit https://lnkd.in/dwXy7VE and he will provide the solution. #thrustboring #teamtrenchless #development #developer #developers #trenchless #trenchlesssolutions #trenchlesstechnology #sewer #guidedaugerboring #augerboring #pipeinstallation #naylor #naylordenlok #naylordrainage #drainage #clay #pipe #pipework #thrustboring #tunnelling #tunnel #tunnelling #construction #ukstt #scunthorpe #civils #yorkshirewater #wastewater #wastewatersolutions #directionaldrilling
To view or add a comment, sign in
-
Diamer Basha is making significant strides towards its projected completion milestones, with key progress in critical components like the Dam Pit Area, Left Bank Abutment slopes, and LB Power Intake structure. Dewatering operations are ongoing at a rate of 1,100 cubic meters per hour Seepage analysis reveals an inflow of around 665 from the LLO platform Guide wall and Main Cofferdams, with highest utilized factors ranging between 10 to 12 LU. #Progress #DAM #CivilWorks #Engineering
To view or add a comment, sign in
-
It is great to see Energi Solutions delivering for our client with key innovations to ensure we deliver to budget and to programme #EV #EVinfrastructure #ICP #EVpartners #power #powerdesign #powerdelivery #powerinfrastructure #O&M
Today we have successfully installed the Banagher A1 Pre Cast Base in preparation for another Package Substation to be installed at our site in #Ashford. The A1 Base is fully approved for use on the #UKPN Network and comes in 2 pre cast sections which are offloaded via a Hiab straight into the pre prepared excavation. With successful and careful planning, the A1 Base, Package Substation, GRP and other associated equipment can all be installed within just a few days. This significantly reduces project programmes and labour time onsite. Banagher Precast Concrete Kevin Welstead #EVHub #Civils #ICP #HV #EVChargingHub #PackageSubstation #EnergiSolutions
To view or add a comment, sign in
-
Fixing the segmented insulation membrane for the raft foundation using a torch lump should have a minimum overlap length of 10 centimeters for the floor. For floor-wall joints, the minimum overlap should be 15 centimeters. #Construction #Civil #Membrane #Foundation #Insulation #Quality #BestPractice #Forum #Raft
To view or add a comment, sign in
-
...Cofferdam.... - Cofferdams are temporary structures used in construction to create a dry work environment in areas with water. - They are typically built using steel sheet piles, concrete, or other materials to form a barrier around the construction site. - Once the cofferdam is in place, water is pumped out from the enclosed area, allowing construction work to proceed. - Cofferdams are commonly used in projects such as bridge construction, dam building, and offshore drilling. - They provide a safe and dry working environment for construction crews and equipment. - After construction is complete, the cofferdam is often dismantled or removed. All right are reserved to the respect owner. #civilconstruction #civilengineering #bridgeconstruction
To view or add a comment, sign in
-
GeoGrid in road construction is designed to interlock & confine the aggregate. It will work as a mechanically stable layer and evenly distribute the load. Its increased bearing capacity & Its used to reduced the vertical stress
To view or add a comment, sign in
-
Watch a demonstration video showcasing the installation and disassembly process of our Overlapping mats. Each mat weighs 283kg and can support a load of 120 tons. These mats are designed to meet various road conditions, ensuring construction safety and smooth operations. #groundprotection #groundinvestigation #maincontractor #architect #civilengineering #road #transmissionlines #crane #pipeline #waterindustry #gasindustry #drillingrig.
To view or add a comment, sign in
-
"Strength in Symmetry: PSC Girders Bearing the Weight of Progress A prestressed concrete (PSC) girder is a structural element used in bridge construction. It's a type of girder made of concrete that has been prestressed, meaning it's been subjected to a compression force before being used, improving its strength and load-bearing capacity. PSC girders are commonly used due to their ability to span long distances and handle heavy loads. #prestressed #psc #bridges #roads #civilengineering #civilengineer #civilconstruction #engenhariacivil #engenharia #construction
To view or add a comment, sign in
-
At Provenance Engineering, we believe in finding the right solution for every challenge—whether it’s a small feasibility study or a multi-million-dollar project. We work closely with our clients to understand their needs and deliver solutions that is right for them. A great example of this was the first fusible PVC force main constructed via a hydraulic direction drill completed for the City of Lubbock’s 2nd largest lift station. Faced with hydraulic changes, 70-year old force main, and congestion concrete street, we designed a trenchless solution of over 4,400 feet of new 14-inch force main —providing the City with both a cost-effective and innovative solution completed ahead of schedule. At Provenance, we don’t just deliver projects—we provide long-term value by listening to our clients and developing a unique solution to each challenge. #BeRooted #UniquelyDifferent #InnovationInWater #ProvenanceEngineering #WastewaterInfrastructure #SustainableSolutions #WaterIndustry
To view or add a comment, sign in
5,675 followers
New days HDD operator for CMW back on Ditch Witch 3020AT
1moWell done to all who was involved. It’s great to see projects like this been achieved. UEA has a great name in the drilling industry, for large projects like this.