The 7 Steps to Complete an Arc Flash Analysis

No alt text provided for this image

By Scott King, VP & National Director of Electrical Safety Services, Hallam-ICS


What is an Arc Flash Study?

An arc flash study is an engineered incident energy analysis defined to establish safety protocol for qualified electrical personnel required to work on electrical equipment and circuit parts that cannot be placed in an electrically safe work condition. 

Protocol such as proper levels of PPE based on both the shock and arc flash boundaries are defined by the calculated incident energy.  Other benefits of an engineered arc flash study include a short circuit & coordination study and updated facility electrical documentation including one-line diagrams and electrical equipment locations.

It is important to understand the process and the “behind the scenes” details of an arc flash analysis. My other posts describe the importance of an Arc Flash Analysis: how it saves lives and how to find the right information, In general, the following seven steps are required for the completion of a thorough arc flash analysis:


No alt text provided for this image


STEP 1: Acquire existing as-built documentation

The usual starting point for an Arc Flash Analysis is to gather all of the existing electrical drawings that an Owner may have. These would typically include:

  • Drawings (such as floor plans)
  • Riser one-line diagrams

If the documentation does not exist, electrical one-lines have to be developed in the field requiring a detailed field survey.

 

The electrical one-line diagram is the facility electrical distribution road map and is a key part of an Arc Flash Analysis.


No alt text provided for this image

 A sample electrical one-line diagram 

 

STEP 2: Field verification

Before loading the data from the electrical drawings into the Arc Flash Analysis software, the drawings must be field verified. This requires a survey of each site to verify one-line documentation and document any missing information in order to generate an encompassing and accurate one-line.

Equipment covers need to come off so we can visually inspect and acquire PD (protective device) manufacturer/types/sizes/settings, cable type/lengths, transformer impedance values, and KVA sizes. Look below for types of equipment surveyed.


No alt text provided for this image

 After we gather this information, the covers are then re-installed. De-energizing of equipment is very rare.

 

Webinar Recording:  3 WAYS TO COMPLETE AN ARC FLASH ASSESSMENT ON A LIMITED BUDGET

 

STEP 3: Loading Information

After the field survey is complete and the information on the drawings has been verified, this information is then loaded into our software package (SKM Power Tools) to run the Short Circuit, Coordination, and Arc Flash analysis – as shown below.

Loading a one-line diagram into SKM looks relative to this:


No alt text provided for this image

 

STEP 4: Run a Short Circuit Study

Once the data has been loaded into SKM Power Tools, we review the 3 phase and single line to ground fault currents against the protective device “duty rating” to ensure the device can clear the fault. If a fault occurs at any given protective device, the value of the duty rating is the amount of fault current the device can handle and clear the fault in what we call a “bolted fault”. In other words, if the available fault current is less than the duty rating of the device, the device will do what it is intended and manufactured to do (clear it). If the fault currents are more than the duty rating, the device will likely fail and cause an arc flash incident.

 

No alt text provided for this image


DOWNLOAD WHITE PAPER: Arc Flash Analysis Essentials

 

STEP 5: Selective coordination

Utilizing the field data and SKM Power Tools, a coordination study is then completed. In a properly coordinated system, the nearest protective device upstream of the fault will clear the fault without affecting protective devices further upstream. This will limit the impact of a fault on the overall electrical distribution only to where the fault is located. 

In order to be assured that all over current protection devices are coordinated, it is necessary to look at the time vs. current characteristics of each device and compare it to the characteristics of any upstream devices.

 

No alt text provided for this image


It is critical that a facility have proper coordination. Below is an example of “poor coordination” and “improved coordination”.

 

Poor Coordination

Ideally, where a fault occurs the localized protective device should clear the fault, otherwise, the fault travels back through the system and may trip the building main service device, thus losing power to the entire facility.

 

No alt text provided for this image


Improved Coordination

By making adjustments to the settings of those protective devices that cross over on the time current curve, we are able to clean up the coordination issues. The fault clears at the fault location. Adjustments that we typically make on a protective device (i.e. circuit breaker with these options) include; long time delay, short time pickup, short time delay, and instantaneous.

 

No alt text provided for this image


STEP 6: Arc Flash Evaluation

As part of our report, we evaluate the “as is” condition of the equipment being considered in the study. When applicable, we provide recommendations to lower the incident energy levels including maximizing coordination. How we do this and as mentioned in section 5 above, for those protective devices that have the option of making setting adjustments, we can adjust for both; good coordination and lowering of “incident energy levels”. Of course, we look at coordination and arc flash energy “incident energy” hand in hand. Sometimes one does not compliment the other and therefore, we have to review both to maximize the best setting(s) for each.

 

STEP 7: System Evaluation

Completing the Arc Flash study includes:

  • Generating and applying the Arc Flash labels
  • Training of the electrical staff

Personnel Protective Equipment (PPE)

Personnel Protective Equipment (PPE) includes clothing and equipment that provide full body protection in the event of an arc flash incident or electrical shock. The protection is based on the NFPA 70E guideline requirement of not receiving more than a second degree burn. A second degree burn is typically non-disabling and curable.


No alt text provided for this image

 

Arc Flash Labels

The nominal voltage and arc flash boundary are required on all labels and at least one of the following: available incident energy with the corresponding working distance, minimum arc rating of clothing or specific level of PPE. Generally, we prefer to provide more information than is required on an arc flash label as defined by NFPA 70E. As you can see from our sample label, all the information described is provided.

 

No alt text provided for this image


Arc Flash Training

Who should have the electrical safety training? The electrical safety training should be provided to any staff who might work on the electrical gear and it is the final step in the Arc Flash Analysis. Hallam-ICS staff have been certified to provide qualified electrical safety training.

This third entry continues the dialogue describing the importance of performing an arc flash analysis/assessment at your facility and the benefits of doing so. I hope this information has been helpful and in my next entry, I will discuss the importance of having your personnel properly trained on the electrical hazards. We call this “Qualified Electrical Safety Training” – another requirement of NFPA 70E.

 

No alt text provided for this image

 

About the Author

Scott King is the VP & National Director of Electrical Safety Services. Scott has been with Hallam-ICS for over 30 years.  Scott and his team have been conducting power system studies for over 17 years.

About Hallam-ICS

Hallam-ICS is an engineering and automation company that designs MEP systems for facilities and plants, engineers control and automation solutions, and ensures safety and regulatory compliance through arc flash studies, commissioning, and validation. Our offices are located in MassachusettsConnecticutNew YorkVermont and North Carolina and our projects take us world-wide.