AdventHealth Hospital

AdventHealth Hospital

This six-story, AdventHealth Hospital located in Overland Park, KS was two months behind schedule until our PS=Ø® system was utilized on the last three levels. The results:

• Pour strips and backshoring eliminated

• Increased productivity by every trade

• Over two months in schedule savings

• Opened on time