How to install and lay the sandwich system running track and Artificial turf pitch  ?

How to install and lay the sandwich system running track and Artificial turf pitch ?

图片无替代文字

Sandwich System Running Track Construction

  1. Primer treatment (base sealing and joint filling)
  2. Bottom layer construction
  3. Surface layer construction
  4. Runway line marking

图片无替代文字

Artificial turf pitch laying process

  1. Install the shock-absorbing pads
  2. Laying the turf and coat proper volume of matched glue at the back of turf and on the surface of joint tape.
  3. Cut off and inlay the functional line(join the pre-cut white functional lines and green grass with joint tape).
  4. Infill the silica sand
  5. Infill the rubber granule
  6. Grooming

www.greenvalleyrubber.com


To view or add a comment, sign in

Insights from the community

Others also viewed

Explore topics