What are the precautions for the construction of workshop concrete solidified ground?
Notice for construction of concrete solidified floor in workshop
1. Base level work. Because the concrete sealing curing agent belongs to liquid coating, it does not have leveling function, and the ground needs leveling after the base construction.
2, grass-roots cleaning work. If the cement slag, oil, sand and other impurities in the concrete sealing curing agent ground base are not cleaned up, it will block the pores of the base, thus affecting the concrete sealing curing agent to better penetrate the ground.
3. Basic maintenance work. If the concrete sealing curing agent floor construction base curing is not good, easy to cause the ground cracking. Therefore, 5 hours after the end of basic construction, must be cured with sprinkling, to ensure that the surface of concrete base is always wet, curing time should not be less than 7 days.
Characteristics of concrete solidified floor in workshop;
1, greatly improve the ground hardness, wear resistance, prevent the ground sand and dust.
2, anti-slip, anti-seepage (water, oil into concrete, can resist a certain degree of acid and alkali)
3, colorless, tasteless, no chemical residue
4, long service life, up to more than ten years, the brightness increases with the service life.
5, do not maintain, usually use mop and water.
6. Simple construction and short cycle. After the completion of construction, can directly bear the load.
✎Z-lion is your best choice with the CONCRETE DIAMOND TOOLS in China.
☀Any demands and special customize are accepted.
-WEB: www.zdiamondtools.com
CEO @ Global Marketing Club | Competitive Pricing, Professional Manufacturer | Since 2007, Bridging the gap between 200K+ Chinese manufacturers and overseas buyers.
3yThank you for your likes, the number of likes that you like is my motivation to continue to share!💕🌹👍