Expansion Joint Opens Horizontally at the Middle of the Bridge. MAURER creates unique solution for the Clyde Crossing in Glasgow. The new Clyde Crossing in Glasgow is a double swing bridge that opens at the centre, thanks in part to the special expansion joint from MAURER (Type DS 4 HL). With its unique hydraulic system, it can control the opening and closing of the bridge, as well as compensating for expansions caused by temperature, wind and traffic load like a conventional expansion joint. The Clyde Crossing is Scotland’s latest iconic feat of engineering. It crosses the River Clyde in the Glasgow suburb of Yoker and connects the neighbouring towns of Clydebank and Renfrew. The imposing white steel bridge consists of two swing bridges and was built by a joint venture between JV Hollandia Infra (southern half) and Smulders Iemants (northern half). Two pairs of pylons close to the river bank extend outwards like cranes and pivot with the bridge when it opens. The Clyde Crossing is 184 m long and 12.3 m wide, making it suitable for vehicles, pedestrians and cyclists alike. #expansionjoints #expansionjoint #bridges #bridge #construction #architecture
-
+3