Mackley

Mackley

Civil Engineering

Small Dole, West Sussex 4,852 followers

A collaborative contractor delivering river, coastal, water and complex infrastructure to build a sustainable future.

About us

Mackley provides a comprehensive range of services from conception through construction to project delivery. We specialise in delivering civil engineering projects in the Coastal, Fluvial, Waste, Water, Ports, Harbours, Energy and Infrastructure sectors for Central and Local Government, Utilities Companies and Private Clients. Throughout the entire process we add value through our industry experience and expertise and can support Clients through early contractor involvement to deliver innovative solutions for quality and sustainable projects. We pride ourselves on our ability to tackle potentially challenging projects where others might be less enthusiastic. We have built a solid client base through team work and a strong emphasis on complete client satisfaction.

Industry
Civil Engineering
Company size
51-200 employees
Headquarters
Small Dole, West Sussex
Type
Privately Held
Founded
1931
Specialties
Flood Alleviation, Marine Contrating, Infrastructure, and Renewable Energy

Locations

Employees at Mackley

Updates

  • Very pleased to have worked alongside Beckett Rankine on this #portsandharbours project. Ferry operations at Newhaven Port were maintained for the duration of the programme and we built some excellent relationships with people at the port along the way. We're thrilled with the final result. Watch this space for more details on this challenging project coming soon! #civilengineering #turningplate #weloveachallenge #collaboration

    View organization page for Beckett Rankine, graphic

    2,953 followers

    We're at the United Kingdom Harbour Masters Association Autumn conference - a timely event as we have recently completed our latest project at Newhaven Port. We're proud to have designed, installed and maintained assets for Newhaven Port & Properties Limited for decades. One of these is a unique 'turning plate' installed on the quay wall in 1991, which the ferries use as a buffer when turning 180° in a relatively narrow channel. Working with Mackley, this year we have installed a new, larger turning plate that will allow modular replacement going forward. We have designed the plate to accommodate larger vessel sizes, as well as account for changing tides and rising sea levels. If you're also attending the UK Harbour Masters Autumn conference, we'd love to discuss how our maritime engineering expertise can help your port or harbour. More information on our work at Newhaven, including quay walls, flood defences, jetties and linkspans: https://lnkd.in/egePXKQn #MaritimeEngineering #Ports #Harbours #Marinas #EngineeringSolutions #UKHMA

  • Complex, clever, civil engineering and construction solutions with expertise in design, environmental impact, and stakeholder management 🏗️👷 Our team includes some of the industry's top technical minds and highly skilled specialists, enabling us to take on projects that others shy away from. Want to get in touch? Contact us today: ☎️ 01273 492 212 ✉️ construct@mackley.co.uk #ComplexEngineering #Construction #Expertise #SkilledSpecialists #CivilEngineering

    • No alternative text description for this image
  • Despite some dips in the good weather we had been having, we have been able to get the works underway at Worthing Pier, and the team has made great progress so far. Six 15m steel piles have been driven into the seabed, either side of the pier, further strengthened by capping and bracing. Steel support beams and 16.5m steel trusses on top will take the weight of the pier and enable the removal of the damaged piles and subsequent replacement. The team has been working all hours of the days, nights and weekends, whenever the tide and weather has allowed and will continue to do so until we can get the pier open again. It is an excellent example of Mackley’s emergency call out response and skilful engineering. The progress also shows what good, long term relationships with our clients can achieve when working together, as one big team.  #worthingpier #emergencyresponse #worthing #historicstructure #civilengineering Worthing Borough Council

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
  • Mackley reposted this

    View profile for Terry Fuller, graphic

    Project Director Havant Thicket Reservoir Sales and Strategy Director Mackley

    Havant Thicket Reservoir – The Directors Cut Post 8 – Cathedral It’s not a cathedral, obviously, it is the trial section of our main culvert through which water is taken from the reservoir, but I found myself looking up with similar wonder at the scale and intricacy of the falsework (temporary supports) and shuttering (mould) needed for its construction. In post 6, I explained why and how the culvert functions and why we have built this trial which, now complete, has provided some essential learning. We have identified ways that the falsework system for the shuttering can be erected and then moved along to build the adjacent section more efficiently. There will be around 20 sections in total. The real culvert has the additional challenge of only being accessible from one free end so we had to make sure we planned for that restriction. Pouring and compacting concrete in between curved shutters was always going to be a challenge, especially on the outside surface where gravity is against us. We have had good results but have had to bear in mind that the trial length is only 3 metres long and the real sections will be 12 metres long making this even more challenging. As a result of the trial we have adapted our compaction strategy to include direct vibration of the shutters (which compacts the concrete and removes air) and ‘letter boxes’ in the shutters to allow access for further compaction and inspection as we go. We have also learned a lot about our preferred concrete mix, curing times and temperatures, installing the water seal at each joint between sections and building the culvert safely. I would like to say thank you and well done to our team who have worked diligently and with determination to get this right and learn as much as we can. They tell me they have enjoyed the experience which is great to hear and this gives us the encouragement to move onto the real thing.

    • No alternative text description for this image
  • We are thrilled to have been awarded Platinum accredited membership as part of The 5% Club's esteemed 2024-25 Employer Audit Scheme 🙌 This recognition highlights our dedication to empowering employees through "earn and learn" programmes at Mackley, including Apprenticeships, Graduate Schemes, and more. We are proud to invest in the future of our workforce and look forward to expanding these opportunities even further in the future. #5percentclub #Platinum #STEM #Apprenticeships #GraduateSchemes #Construction #Engineering

    • No alternative text description for this image
  • Delighted to share that our Ventnor Eastern Esplanade Project is featured in the latest edition Current Magazine (page 15), which celebrates key frameworks and projects advancing Net Zero Carbon goals. From protecting coastal areas and exploring nature-based flood solutions to using digital innovations and tools to enable efficiencies and carbon savings, this issue highlights crucial efforts to create safer, more sustainable communities and environments. Read more here: https://lnkd.in/e43PPQjp   #NetZero #SustainableFuture #CoastalProtection #CurrentMagazine #Decarbonisation #FloodSolution

  • 🚧 Project Spotlight: Tower Wharf Jetty Replacement Originally built in the 1950s, the Seacon jetty on the Thames had reached the end of its design life and needed a major upgrade. This vital facility supports shipments of neo-bulk cargo like steel, metals, and timber—meaning our team had to keep operations running smoothly throughout. Our work included: 🔹 Diverting services beneath the new ramp footprint 🔹 Installing 36m tube piles to support the new jetty structure 🔹 Building a bulk-fill access ramp connecting the jetty to access roads 🔹 Fitting pre-cast deck units and finishing with tarmac surfacing 🔹 Complex excavation behind the river wall With strict constraints, like timing our piling to protect migratory fish and ensuring the neighbouring jetty stayed open, our team completed this project with precision and care. To find out more, visit: https://lnkd.in/eA9HEUDe #Construction #Engineering #TowerWharf #JettyReplacement #ProjectManagement

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
  • This #NationalEngineeringDay 2024, we visited TeenTech in Sussex to challenge students from across the region to think about the incredible engineering required to protect our coastline from waves and weather. Using our very own wave tank and ‘Brighton Beach’ setting, we asked students to choose from a selection of flood defences and to test them in the tank. The aim was for the group to decide which engineered approach was the most effective, balancing that with the needs of the setting. Students got stuck in, asking lots of questions about the advantages and disadvantages of hard and soft engineering and our team were on hand to answer even the trickiest of questions. Each session produced lively debate and lots of creative thinking. The Royal Academy of Engineering say that ‘for a new, more diverse generation to aspire to join our brilliant profession, research tells us that they need role models who inspire and excite them about the possibilities of engineering’. Hopefully we inspired the students we met today – they certainly inspired us with their enthusiasm and ideas. #NationalEngineeringDay #EngineeringRoleModels #teentechsussex

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image

Similar pages

Browse jobs