Civil Infrastructure Group’s Post

CIG have finished pouring the abutment of North East Link's marque bridge. CIG proposed a non-conforming tender for this project. We identified a cost saving if the design was changed from precast architectural pattern to a fully insitu construction methodology. We worked through our proposed process with SPARK to demonstrate that we could deliver a quality finish when combining the pattern with the huge 11.7m high continuous pours required. We always strive for innovative approaches to save projects money, and we really enjoyed working with our client to make this one a reality. Project highlights; - 720m2 of architectural pattern - 1004m3 of coloured concrete and 1315m3 of grey concrete - 11.7 max height

  • No alternative text description for this image
  • No alternative text description for this image
Tristan Iriks

Senior Structural Engineer

1mo

What were the savings?

Like
Reply
Blake Bambridge

Fire Systems Senior Project Engineer

1mo

Looks great 👍

Like
Reply
Seamus McHugh

MD of Premier Constructions AU | Investor | We're hiring!

1mo

Congrats! Great work CIG

Cheng (Winston) C.

Site Engineer at Civil Infrastructure Group

1mo
Like
Reply
Katrina Power

Open to Rail Work or Major projects work

1mo

Congrats!

See more comments

To view or add a comment, sign in

Explore topics