Lankhorst Rail’s Post

No one wants a derailment but if one occurs then replacing damaged wooden and concrete sleepers can delay the resumption of rail services. This isn't the case with #KLP Hybrid Polymer Sleepers, as one rail operator discovered recently when a fully loaded truck, with axle load 10 tonnes was derailed. The wheel flange pressed into the sleeper surface with 5 tonnes load. As you can see there are only surface scratches, demonstrating the quality and robustness of the #KLP sleepers. Not having to replace the sleepers meant rail services were soon back up and running. Lankhorst Engineered Products, Lankhorst Rail, WireCo, HIRD Group, InnoTrans, #railway #crosstie #railroad

  • No alternative text description for this image
  • No alternative text description for this image

To view or add a comment, sign in

Explore topics