PSSE simulation of 10MW Solar Park Project

PSSE simulation of 10MW Solar Park Project

1.Single Line Diagram

2.Modeling and Aggregation:


PSCAD: Cable constant calculation and Validation:

3.Required file:

  • Base Case / SLD/dynamic file /Playback/Recorded automated file in python

4.Required studies/model testing:

-Flat Run

-Fault ride through

-Active/reactive power control: set point

-Voltage control: setpoint / system voltage variation

-Frequency sensitivity

-VAR Capability.


#PSSE

#SolarPark

#PSCAD


Azzam Omer Alfarog

Electrical Engineer || Power Networks Design Engineer || Distribution Planning Engineer || Project Engineer || MSc (CN) || PMP® || (PMI-RMP)® || IOSH®

5mo

Very informative 😊

Like
Reply
Hashim Dahab

ELECTRICAL Engineer || UPDA Grade A || MEM || IOSH || TOT

6mo

Brilliant work

Yasir Kazi

Renewable Energy | Energy Transition | Energy Storage | Sustainability

6mo

Good work!

Awab Alameen

Power System Engineer | PSS/E

6mo

Great work.

To view or add a comment, sign in

Insights from the community

Others also viewed

Explore topics