Ni-repost ito ni GODEL CONCRETE AND SYSTEMS INC
Happening right now! For our Client Prime Metro BMD Corporation (PrimeBMD) at their Upper Wawa Pump Station (UWPS) Project we are supplying stable 21 MPa PCD Mix for the the Shearwall and Colums of the 3rd level at the Control Building. Due to availability constraints in this very remote area, this concrete mix was purposely designed using crushed sand only, without any Vibrosand / Riversand. Good job GODEL CONCRETE AND SYSTEMS INC