🏗 The Yorkshire Lass, a public house, was reimagined as five modern apartments with a basement car park, delivered in just 12 weeks. This redevelopment project, commissioned by Graycliffe Homes Ltd, highlights the efficiency and sustainability of Insulated Concrete Formwork (ICF) construction.
Key elements of the build included:
➡️ Over 1,000 m² of ICF walls, providing excellent energy efficiency and durability.
➡️ More than 200 m³ of structural concrete, with crystalline waterproofing for the basement.
➡️ 500 m² of precast hollowcore flooring installed across the first and second floors.
The project involved a close collaboration between Graycliffe Homes Limited , STL Projects Ltd , Jonathan Hayes, and Amvic Building Solutions UK. From the demolition of the original structure to the installation of high-performance materials, the Yorkshire Lass redevelopment showcases how modern construction techniques can preserve functionality while offering sustainable solutions.
Brian Duffy Alan O' Brien Cillian Canavan Ian O'Regan
For more on ICF and its applications, visit amvicIreland.com
#Construction #ICF #Sustainability #InsulatedConcreteFormwork
DIRECTOR at SUNLINEACT
1moSounds good Rho, sounds like another WBA commercial project notched up, if so well done, keep doing things right 👍