Deep Excavation LLC’s Post

In this How-to Wednesday: How to use a 2-stage facing (temporary and permanent facing) on a soil nail wall model in SnailPlus Unlock the full potential of SnailPlus by mastering 2-stage facings on soil nail wall models. This guide shows how to effectively use both temporary and permanent facings, giving engineers control over reinforcement adjustments at each construction phase. Start with the temporary facing, reinforced on the “left” or “bottom” side for initial stability, and seamlessly integrate permanent facing with additional reinforcement in later stages. SnailPlus facilitates the seamless switch between facings, enhancing safety and efficiency. Adjustments to thickness, reinforcement spacing, and material selections allow for tailored structural behavior, ensuring your project meets required factors for each stage. Conduct comprehensive geotechnical checks, analyze shear and moment capacities, and adapt to project needs with ease. 👍Want to elevate your project workflow? 👉Visit our site and explore SnailPlus features #DeepExcavation #SnailPlus #GeotechnicalEngineering

To view or add a comment, sign in

Explore topics