PCE Limited’s Post

🏗️ Brent Cross Plot 1 looking good 🎥 This 14 storey, 300,000 sq. ft hybrid structure combines responsibly sourced engineered cross-laminated timber with precast concrete, the first time this form of construction has been used across Europe 🌍 Leveraging PCE’s HybriDfMA Frame system, we’re partnering with BAM UK & Ireland to deliver safer, faster, and higher-quality construction, with sustainability a top priority - the hybrid solution reduces embodied carbon by 22% compared with traditional insitu 🌱 https://lnkd.in/gTdqrxi4 Client: Related Argent Design team collaborators: Heyne Tillett Steel shedkm Curtins Supply chain collaborators: EURBAN Limited Forterra PLC SWP Concrete Solutions Ltd Flood Precast Kerkstoel NV Oranmore Precast Peikko Group Corporation #DfMA #Offsite #Construction #Sustainability #Timber #Precast #Hybrid #London #Build #Collaboration

View profile for Mark Tillett, graphic

Director at Heyne Tillett Steel

Last week we had a team site visit to 3 Copper Square, Brent Cross - it’s looking totally stunning.   We’re at 4th floor of this 300,000 sq ft office building, using a precast concrete frame supporting CLT slabs. This is the first time this form of construction has been used and built in Europe. We proposed this 7 years ago and our brilliant client, Related Argent, have stuck with us on it ever since.   We have been working with shedkm, Gardiner & Theobald LLP, Faithful+Gould and Atelier Ten, and built by BAM UK & Ireland, PCE Limited and EURBAN Limited on site. Great work Krzysztof Marcinkiewicz and all the home team.   As Rudyard Kipling said; gardens are not made by singing “oh how beautiful “ and sitting in the shade.

To view or add a comment, sign in

Explore topics